Lucas Oil Stadium in Indianapolis is positioned below street level, so wastewater from upper levels can gravity-flow to the city mains, but sewage from the lower-levels must be pumped for removal. Zoeller installed 10 Heavy-duty spherical solids-handling pumps and one commercial duty effluent pump.
Read more »
Randall’s Island, a popular outdoor destination in New York City, had a collection system with numerous small pump stations that began experiencing frequent clogging that required emergency service. They replaced their system with Zoeller’s bi-direction submersible grinder pumps to solve their ongoing issue.
Read more »
In Grass Valley, California, when an existing sewage system in a campground failed, a duplex pump system was installed to handle the job. Two heavy-duty, solids-handling pumps from Zoeller Engineered products were installed on 4” rail systems.
Read more »
JP Bachand Contracting in Newington, CT were hired to replace an old but still running sump pump in a residential home. After learning from the home owner how old the pump was he contacted Zoeller which confirmed it was 47 years old.
Read more »